Concrete equipment pads
Concrete Transformer Pads in Dallas–Fort Worth
When the utility or the engineer hands you a pad drawing for a pad-mount transformer, somebody has to build it to the drawing. Send it to us. We'll form it, pour it and leave it ready for the set.
Send us the jobWhat we handle
- Excavation and a compacted base
- Forms and reinforcement per the drawing
- The pour and finish
What you handle
Coordinating with the utility, the conduit and the inspection.
How we size it
Utilities like Oncor and the electric co-ops publish their own pad requirements, and some supply the pad themselves. We don't guess: we build to the drawing you're given. No drawing yet? Ask the utility first.
Send us the job
- Job address
- The pad drawing (utility or engineer)
- Transformer size, if you know it
- Access for a concrete truck
- The utility's set date
Pouring equipment pads across the DFW metroplex: Dallas, Fort Worth, Arlington, Weatherford, Azle, Denton, Plano, Frisco, Irving, Grapevine and surrounding towns.
Other pads we pour